VNO-NCW Co-Creatie

⭐️⭐️⭐️⭐️⭐️⭐️⭐️⭐️

Projects of VNO-NCW Co-Creatie

Start

2020-01-01

2025-12-31

End

Description

Activities aimed at making business parks more sustainable: - solutions for grid congestion through energy hubs - promote a sustainable economy and business operations, including the establishment of a raw materials market - encourage sustainable mobility by increasing the level of organization - knowledge sharing

Phase

Execution

Facilitation

Residents involved?

No

Other projects where VNO-NCW Co-Creatie works on:

Start

2023-11-13

2030-12-31

End

Description

On industrial estates, the risk of waterlogging and heat is high due to the lack of greenery and the presence of a lot of hard surfaces. Damage and inconvenience caused by climate change on industrial estates can be mitigated by designing them to be green and shaded. This makes industrial estates more climate-resilient and enhances the quality of the living and working environment.

Phase

None

Residents involved?

No

Start

2023-11-13

2030-12-31

End

Description

As Enpuls, we would like to get started with the mission path of energy & smart grids. However, we do not yet have a concrete project for this.

Phase

Idea

Facilitation

Interested

Residents involved?

No

Start

2023-11-13

2030-12-31

End

Description

A sustainable and circular economy focuses on reducing consumption, production, and the reuse of products, materials, and resources. Companies have an important role in this.

Phase

None

Facilitation

Interested

Residents involved?

No

Start

2023-01-01

2026-01-01

End

Description

Sustainability of Industrial Park de Hurk is focused on four sub-tasks: sustainable and smart energy use, space for greenery, water and innovation, sustainable construction and closing loops. Currently, various sub-projects are underway: collective energy solutions, green walking paths, sustainable mobility, sustainable construction and work, closed loops de Hurk, communication & events, and monitoring. These are carried out by BIZ de Hurk, a collaboration among entrepreneurs in Eindhoven. The sub-projects are executed under the banner "De Hurk Werkt!" Read more about the activities in 2024 at: https://eur03.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.dehurkwerkt.nl%2Fnieuws%2Fdit-gaan-we-doen-in-2024%2F&data=05%7C02%7Ckristel.mooij%40eindhoven.nl%7Caf36c1b9fb34452ba34008dc5a2c84b4%7Cf3ec39e8aec4458594574b7f7d82af96%7C0%7C0%7C638484394483823402%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=2bPLUaUUdN4SsnoU1TF9NnkjWt0WXfOxQW7XWKHZcUg%3D&reserved=0

Investment

€ 750.000,00

Phase

Execution

Facilitation

Residents involved?

No

Mission Pathways

Representatives of VNO-NCW Co-Creatie are committed to the following mission pathways:

⭐️

Collaboration and knowledge sharing

Together we increase awareness and engage ambassadors, frontrunners, and exemplary projects aimed at the sustainability of business activities in our cities.

⭐️

Energy and smart grids

Business parks are large consumers of energy. Sustainable energy from solar and wind is increasingly being generated. By managing demand in combination with storage and a so-called 'smart grid', this can be better aligned with supply.

⭐️

Healthy green working environment

In industrial areas, the risk of waterlogging and heat is often high due to the lack of greenery and the extensive hard surfaces. Damage and nuisance from climate change in industrial areas can be mitigated by designing them to be green and shaded. This makes industrial areas more climate-resilient and improves the quality of the living and working environment.

⭐️

Network congestion

The demand for and supply of (sustainable) electricity are increasing. All this electricity needs to be transported through the existing cables (the electricity grid). More capacity must be created on the grid as soon as possible, and we will need to make smarter and more optimal use of the grid. This is being addressed at provincial and regional levels, including through the regional taskforce and pMIEK.

⭐️

Regional raw materials market

To prevent new raw materials from being used in construction and industry, a circular raw materials bank can provide a solution. Here, reusable materials are registered and made available.

⭐️

Scaling up sustainable business parks

Sustainability of a business park requires a collective approach. This means cooperation between entrepreneurs (association), property owners, suppliers, advisors, and the government.

⭐️

Sustainable and circular business operations

A sustainable and circular economy focuses on reducing consumption, production, and the reuse of products, materials, and raw materials. Companies play an important role in this.

⭐️

Sustainable mobility and logistics

There are various ways to make mobility in the business park more sustainable. Sustainable commuting to and from work offers various benefits and opportunities. It results in climate gains, it is healthier, and it is often cheaper. Working from home, using public transport or cycling to work, carpooling, or using an electric bike.

Climate Mission Helmond & Eindhoven

Eindhoven and Helmond are working together to become climate-neutral faster and smarter. So that Eindhoven and Helmond are now and in the future pleasant places to live, work and recreate. We map out which actions are needed to get there and who has what role in that.

For more information: eindhovenduurzaam.nl/klimaatmissie or www.heelhelmondduurzaam.nl

For questions and/or comments you can send an email to: duurzaamheid@eindhoven.nl or energietransitie@helmond.nl

What if we succeed?

Cookie Policy
Change language: